Site Loader

Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Kajigis Brazil
Country: Belgium
Language: English (Spanish)
Genre: Science
Published (Last): 21 July 2014
Pages: 459
PDF File Size: 13.33 Mb
ePub File Size: 20.78 Mb
ISBN: 282-2-53144-901-3
Downloads: 55199
Price: Free* [*Free Regsitration Required]
Uploader: Sajas

Ilijan Combined-Cycle Power Plant

Email required Address never made public. The plant cannot operate in simple-cycle mode because it has no bypass stack.

This is the first G placed into commercial service outside Japan. Obstacles that developers of plants in the U.

Ilijan Power Plant | Joel Chavez Group of Companies

To find out more, including how to control cookies, see here: This air is supplied as the cooling and sealing air for the turbine disks and rotating blades after being externally cooled and filtered. Each unit is composed of a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator. The plant is rated at 1, MW net on the high-voltage side of the main transformers.

Fill in your details below or plnt an icon to log in: Seawater is used for condenser cooling water. Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that had to be built to support it see table. During natural gas firing, one operates while the other two remain on standby. The DLN combustor in the MHI G gas turbines consists of a pilot nozzle, eight main plan nozzles, air bypass valves, and a double-wall structure for basket and transitions.

Rotor cooling air is provided with compressor discharge air extracted from the combustor shell. The G gas turbine uses steam taken from the bottoming cycle for cooling the combustor liner. Rita power plant to the Calaca substation. San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan.

  CORPORATE FINANCE VERNIMMEN 2011 PDF

It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors. Leave a Reply Cancel reply Enter your comment here Cooling circuits for the turbine powef are similar to those of the F series.

SMC Global Power

PlqntMirant Corp. From there, the gas is transported through a in-diameter onshore pipeline running 9 miles to the plant. The plant entered commercial service on June 5, Commercial operation was in October 1, You are commenting using your Twitter account.

Commercial operations using natural gas as the primary fuel commenced on January 1, San Lorenzo power plant started using liquid fuel gas oil, naptha, condensate for testing and commissioning by late The plant was operated on liquid fuel gas oil, naptha, condensate until the end of Rita, Batangas City adjacent to Sta.

Ilijan combined-cycle project operational summary Source: Intermediate steam and primary superheater outlet steam serve as a backup for GT combustor transition piece p,ant and are returned to the hot reheat steam. The blade passage temperature and mechanical llant of all four GTs were maintained within satisfactory levels. Inside the combustion chamber, the flame temperature of G combustors is between pwer and 2,F. All three trains can be put into service when the plant burns diesel oil to supply adequate makeup demin water to the combustion turbines when water injection is used to control NOx emissions.

Liquid fuel was used as back-up fuel thereafter. Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities.

RSS feed for comments on this post. Each gas turbine generator has a nominal ilijam gross rated output of MW and MW for each of powfr turbine generators. Ilijan combined-cycle project operational summary. The plant also share common facilities being used by the Sta. Each unit is composed of gas turbine, steam turbine generator and the corresponding heat recovery steam generator. Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes.

  KNJIZNO ODOBRENJE OBRAZAC PDF

You are commenting using your WordPress. Notify me of new comments via email. REOL for the construction phase. The plant has two power blocks, each ilian 2 x 1 configuration based on the Mitsubishi G gas turbine. First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.

The water treatment system provides a continuous supply of the high-quality demin water required for plant makeup, gas turbine water injection for NOx control, plantt dilution water for chemical feed systems.

They consist of a rotor cooling circuit and four stationary vane-cooling circuits. You are commenting using your Facebook account. First G series turbine outside Japan.

Power Gas Markets

Rita power plant consists of four 4 units with a plant rated capacity of MW each when operating on liquid fuel The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. Ground was broken on March 15,with the start of civil construction works. The facility is being operated by Siemens Power Corporations, Inc.

The plant consists plang two 2 units with a plant rated capacity of MW each when operating in liquid fuel